Remove the Front Coerce Shaft on a 4WD Chevy
You may need to rotate the drive shaft to receive to all the bolts. Shift the transfer case into neutral, allowing it to spin freely.6.
Instructions
1. Up thrust the front of your Chevy with a jack. Domicile a establish of jack stands under the frame and lower the jack, allowing the Motor lorry to rest securely on the jack stands.
2. Fix the front operate shaft under the Motor lorry. The operate shaft is a elongate cylindrical shaft running from the axle housing to the transfer event ethical carry on the engine.
3. Using a dye pen, area a objective on the guide shaft and one on the yoke to ensure you place the shaft back in the same position when reinstalling it. The drive shaft is balanced and if it installed in a different orientation, it may wobble or vibrate, damaging the shaft, U-joints, axle and transfer case. Mark both ends of the shaft.
4. Move to the front of the shaft where it connects to the axle housing. Remove the four retaining bolts from the pinion yoke with a wrench, then lift off the two retaining straps. Pull straight back on the drive shaft, releasing the two U-joint caps from the yoke.
5. Move to the transfer case end of the drive shaft. Locate the four retaining bolts, remove them with a wrench and pull the shaft off the transfer case.Removing the front coerce shaft on your Chevy Motor lorry may be compulsory whether you obligation to repair the U-joints or provided it is blocking access to another Element that you may be working on. The handle shaft connects to the transfer condition at one foot and the front Driving-wheel yoke on the other. On some early models, the manage shaft had a flange that bolted to the transfer instance on the other hand in next pattern oldness, the flange became a yoke allied to the one on the axle housing.
Remove the front drive shaft from under your Chevy and perform any needed repairs. Be sure to place the drive shaft in a safe place to avoid damage while out of the truck.